Corporate data volumes will double by 2028 and keep growing. We will build IT infrastructure that copes

We design servers, storage, hyper-converged platforms and backup systems for the load that is still ahead. With predictable TCO and measurable RTO/RPO written into the contract.

See the case studies
Dell · Storage Sales Partner of the Year 2025Cisco · Advanced DC ArchitectureIBM · Gold Partner
54%

of serious IT outages worldwide cost the business more than $100,000. One in five costs more than $1 million.

Uptime Institute Annual Outage Analysis 2025
394 ZB

The volume of data in the world will grow almost threefold by 2028 — the driver behind requirements for storage capacity, speed and redundancy.

IDC Global DataSphere Forecast 2024–2028 (via Rivery)
+55.8%

Global spending on data centre systems will grow in 2026 — to $788 billion. The main driver is infrastructure for AI.

Gartner Worldwide IT Spending Forecast, April 2026 (via CIO Dive)
89%

of organisations that survived a ransomware attack reported that the attackers targeted their backups. Without immutable backups, recovery becomes impossible.

Veeam 2025 Ransomware Trends Report (via Object First)

The problems clients most often bring to us

“We have three generations of servers, two storage arrays and an Excel file listing what runs where.”

“We do have backups. When we last tried to restore from them — I do not remember.”

“The cloud looked cheaper at first. Then the monthly bill doubled.”

“We launched an ML project and hit an IO wall. Analysts wait two hours for data.”

We solve business tasks — and the pains of specific people

Bauyrzhan
Bauyrzhan
IT Director / CTO
Bank, 500+ employees

“Our core systems run on servers that are out of support. We have a DR site, but I am not confident we would actually fail over to it. I want one project — with a deadline, a budget and a working DR failover at the end.”

Temirlan
Temirlan
CFO
Industrial or retail company

“I am not against investing in IT — I am against surprises in the invoices. Show me what the infrastructure will cost over five years: hardware, licences, support, migration. Without an ‘additional spend required' six months in.”

Natalya
Natalya
CEO / Owner
Fintech or retail chain

“I should not have to understand what VxRail and QRadar are. I need to know one thing: if the data centre goes down tomorrow, or we get encrypted, do we keep working or not. And what the answer ‘yes' costs.”

How we work

01

Assessment

An Infrastructure Assessment is a survey of the current data centre: servers, storage, virtualisation, backups, storage network. You get a report with a map of the infrastructure and an evaluation of bottlenecks and risks — before signing any contract.

02

Architecture

We design the target infrastructure around the workload and the growth horizon. We calculate TCO including licences, support and scaling. We compare on-prem, hybrid and hyper-converged — and choose the model justified by numbers rather than by fashion.

03

Rollout

We supply the equipment, deploy it and migrate the data. Downtime windows are planned in advance and agreed with the business. In parallel we train your team — training is part of every project.

04

Operation

We hand over full as-built documentation, maintenance procedures and DR scenarios. We support under an SLA: reactive incidents, planned work, firmware and microcode updates.

Areas of expertise

Servers and platforms for AI

Cisco UCS C/B-series and Cisco FlexPod (converged Cisco-NetApp), Dell PowerEdge R/T, HPE Proliant DL/ML, Lenovo ThinkSystem SR/ST. Including NVIDIA-certified configurations for AI/ML and HPC. From a single rack server to a multi-site cluster.

Cisco Silicon One G300 — 102.4 Tbit/s in a single chip for AI fabrics; +28% GPU utilisation and around 70% better energy efficiency (announced February 2026). Cisco Newsroom, 10 February 2026

Storage systems

Dell PowerStore / Unity / ME, HPE Primera / MSA, Pure Storage FlashArray, IBM Storage 5000/7300, Lenovo DE/DM. All-flash and hybrid arrays for databases, analytics, file and object storage.

Pure Storage is a Leader in the Gartner Magic Quadrant for Primary Storage Platforms for the 11th year running. Press release, Oct. 2024

Storage area networks (SAN)

Fibre Channel and Ethernet fabrics on Dell, HPE, Lenovo and IBM platforms (Brocade OEM). Zoning, multipathing, replication between sites, migration without service downtime.

Brocade by Broadcom is the industry standard for enterprise Fibre Channel networks: the technology is shipped by the largest storage vendors. Broadcom Storage Fabrics

Hyper-converged infrastructure (HCI)

Dell VxRail, vSAN on Dell / HPE / Lenovo servers, Nutanix. A single platform of compute + storage + network managed from one console. Linear scaling, predictable per-node cost.

Nutanix is a Leader in the Gartner Magic Quadrant for Distributed Hybrid Infrastructure 2024. Nutanix press release, Oct. 2024

Virtualisation

VMware ESXi and vCenter — the standard of corporate virtualisation for on-prem and hybrid environments. Deployment, migration from physical servers, clustering, vMotion, DRS, upgrades to current releases.

VMware Cloud Foundation is used by 9 of the 10 largest Fortune 500 companies and by 87% of Broadcom's 10,000 largest customers. Broadcom, November 2025

Backup systems

Veeam Backup & Replication, Dell PowerProtect DD, Dell ML/TL tape libraries, HPE MSL, Lenovo TS. Immutable repositories, air gapping, replication to a secondary site.

Veeam is No. 1 in the world by revenue among data protection software vendors: a 13.6% share according to IDC for 2H 2025. Veeam, 2025

Data centre network and fabric

Cisco Nexus, Cisco ACI (Application Centric Infrastructure), SD-Access, Dell N/S series. Multi-fabric extension, EVPN-VXLAN, software-defined segmentation management. We build multi-site data centre networks with automatic policy replication.

Cisco is a Leader in the first Gartner Magic Quadrant for Data Center Switching (31 March 2025), on the strength of Nexus 9000, NX-OS, ACI and Nexus Dashboard. Cisco Blogs, April 2025

Delivered projects

BakAI BankKyrgyzstan

A single storage and data protection perimeter across three sites: Dell VxRail (HCI for applications), Dell ECS (S3 object storage), Dell PowerProtect DD (immutable backups). A joint project with Dell Technologies.

BakAI BankKyrgyzstan

Modernisation of the data centre network across three sites on Cisco ACI. A single software-defined fabric with automatic replication of security and segmentation policies between data centres.

Giprozem / NSDI KyrgyzstanKyrgyzstan

Design and construction of the IT infrastructure for the National Spatial Data Infrastructure. 17 pieces of equipment (Extreme Networks + HPE), SAN, storage, tape library. HLD from scratch, full as-built documentation. A joint project of the Kyrgyz Republic and the Republic of Korea.

MBankKyrgyzstan

Dynatrace rollout — contextual APM analytics and AI for monitoring the digital services of one of the country's largest banks.

The team includes 19 certified engineers. For data infrastructure these are specialists certified in VMware (VCP / VCAP), Cisco CCNP / CCIE Data Center, Dell EMC across the Storage, PowerEdge and VxRail lines, as well as certified specialists in Veeam, IBM Storage and Lenovo. CCIE is Cisco's highest technical certification, held by fewer than 3% of specialists worldwide.

The full list of certifications is available on request.

Servers and storage systems

Verified partner statuses

Partner level defines access to the vendor's engineering resources, delivery speed and support terms. In this area we hold active statuses backed by certificates.

All Green Light statuses
Cloud & AI Infrastructure Partner

Cisco

Titanium Partner

Dell Technologies

Partner Plus · Gold

IBM

Partner Ready · Authorized

HPE

Lenovo 360 · Authorized

Lenovo

Partner · Exadata / SPARC / MySQL Expertise

Oracle

Find out the real state of your IT infrastructure

An Infrastructure Assessment is a survey of servers, storage, virtualisation and backup. You get a map of the infrastructure, a risk assessment and a prioritised modernisation plan. With no obligation to a further contract.

  • A map of the infrastructure with its bottlenecks
  • TCO calculation: on-prem vs hybrid vs cloud
  • A prioritised modernisation plan

Request an Infrastructure Assessment

We reply within one business day

Have doubts? Let us address them

“The cloud is cheaper than our own data centre anyway”

It depends on the workload profile. For a predictable workload, on-prem or HCI is usually more economical than public cloud over a five-year horizon — and without surprises in egress traffic bills. During an Infrastructure Assessment we calculate TCO for both models and show where the line falls.

“We are afraid of losing data during migration”

Migration is planned in advance: we test on a copy, prepare rollback points and agree the windows with the business. We have cases of moving banking data to new platforms — including across three sites at once. Ask and we will show the one closest to your situation.

“The project will drag on for a year”

We break the project into stages with a tangible result at each: first assessment and plan, then the first site, then replication and DR. Every stage has a fixed deadline and an acceptance step. On long projects we work to a roadmap rather than to “as it goes”.